Showing posts with label historic trains. Show all posts
Showing posts with label historic trains. Show all posts

Saturday, August 12, 2023

Historic Passenger Trains Linking Buffalo and New York City

Today’s travelers going between New York State’s two largest cities, Buffalo and New York City, can drive, fly or take Amtrak or the bus. But as late as the 1950’s, travelers could pick from 10 day trains and 11 overnight trains each day, offered by five railroads. I created a spreadsheet showing each railroads' timetables. An interactive version of the map is available here

Map showing five railroads' routes
Brown: Pennsylvania Railroad
Red: Lehigh Valley Railroad
Yellow: Delaware, Lackawanna & Western Railroad 
Orange: Erie Railroad
Green: New York Central Railroad

Delaware, Lackawanna & Western Railroad (DL&W) ran a daylight service from Hoboken, NJ to Buffalo via Scranton, Binghamton, Elmira and Dansville. The DL&W's Buffalo station was built along the waterfront to facilitate train-to-ship transfers and still exists today as the repair shops and storage yard for the Buffalo Metrorail. Of the five routes, it was the second fastest and shortest by mileage. The most famous named train was the Phoebe Snow. Created in 1900 as a fictional woman clad in a white dress, this marketing character was named to promote the anthracite coal used by the DL&W which burned cleaner than other types. Formerly known as the Lackawanna Limited, the train was renamed in 1949 for Phoebe Snow and streamlined at that time, taking 8:15. The Snow was replaced in late 1966 with an overnight service which was discontinued in 1969, ending DL&W service between Buffalo and New York City. 

The ne'er-do-well Erie Railroad was the first to quit the New York City-Buffalo route in 1951. Their unnamed overnight service left Jersey City, NJ in the late evening, arriving in Buffalo after lunch the next day, taking more than 12 hours. Their route was one of the oldest (some sections opened in 1851) and slowest. They were also the first to abandon their Buffalo station in 1935, moving to the Lehigh Valley's station. The service stopped in Port Jervis, Binghamton, and Elmira, the latter two paralleling the DL&W. The route followed every curve of the scenic Delaware River from Port Jervis to Deposit and ran over a high bridge over the falls of Genesee River at Letchworth State Park.

Unlike the Erie and DL&W's New Jersey stations, Lehigh Valley Railroad (LV) used the more convenient Pennsylvania Station in New York City. Its fastest train ran between Buffalo and New York City in about 9.5 hours. Stopping in Allentown, Wilkes-Barrie and Ithaca, its Black Diamond daytime service was named for the coal it hauled out of Pennsylvania. The Diamond’s last run was in 1959. The LV also ran The Star, a dedicated overnight service between Buffalo and New York City. Its Maple Leaf service ran overnight between Toronto and New York City in almost 13 hours, slightly slower than Amtrak’s present-day Maple Leaf. The LV’s remaining passenger trains ended in 1961 and its Buffalo station was demolished in 1960 to construct the William J. Donovan State Office Building, named for the Buffalo-born found of the CIA-predecessor agency. After it closed in 2007, that building was also slated for demolition but was recently converted into a hotel and restaurant.

The New York Central Railroad had the best route between Buffalo and New York City with no mountain ranges to cross and large cities in between. It also had the best-located station in New York City at Grand Central in the heart of midtown Manhattan. Of the five historic passenger train routes between Buffalo and New York City, their route is the only one that still hosts passenger trains. The Central ran multiple daytime trains in as little as 7.5 hours until Amtrak took over in 1971. The route had a number of named trains but among the most famous is the Empire State Express which lends its name to the modern-day Empire Service operated by Amtrak. Five trains provided day time service, five provided overnight service and several others stopped in Buffalo in the middle of the night. The Central used the magnificent Buffalo Central Terminal as did Amtrak in 1979. Starting 1967, the Central reorganized it's trains into a clockface timetable, replacing most of its overnight trains with day trains departing New York City every 2 hours on the half hour.

The Pennsylvania Railroad operated daylight and overnight service between Buffalo and New York City. Its route was the slowest and least direct, stopping at North Philadelphia and Harrisburg before turning north to Buffalo with stops at Williamsport and Olean. The final years required a change of train in Harrisburg to catch the Northern Express or Southern Express which ran between Buffalo and Washington, DC. The day train took 12.5 hours and the overnight service left shortly after dinner to arrive in Buffalo by 8:30 AM. The Pennsy used Buffalo Central Terminal in its later years. This route last ran the day before Amtrak began in 1971.

Today, only four daily day trains connect New York City with Buffalo, taking 8.25 hours, about 45 minutes slower than Amtrak's initial 1971 schedule.

Sunday, July 2, 2023

Retracing the route of the East Wind

Fed up with driving and buoyed by an Amtrak child fare sale, I recently booked three tickets from Alexandria, VA to Dover, NH with a connection in Boston for a summer trip. This modern-day route parallels the East Wind, a seasonal day train that briefly connected Washington, DC with Maine.

In the days before widespread air conditioning and air travel, many Americans would travel north to northern New England and Canada for vacations in the cooler air. Capitalizing on this trend, the East Wind began in 1940 as a limited stop, daytime all-coach seasonal service from Washington, DC to Bangor, ME. Conceived by the Boston and Maine Railroad (B&M), it also operated on the Maine Central, New Haven Railroad, and Pennsylvania. At the time, most long-distance trains were overnight sleeper services including the B&M’s own Bar Harbor Express and State of Maine and those additional fares for the sleeper service went to the Pullman Company instead of the railroads themselves.

The East Wind’s consist included a baggage car, three coaches, a tavern-lounge car and a dining car. For its first three seasons, the two trainsets were painted yellow but after World War II, the trainsets had the liveries of the operating railroads. The train would have held 200-250 passengers depending on how many seats each coach held.

                    1941 Timetable                                                1955 Timetable

Here are some of the timetables from 1941-1955 as well as two potential timetables for a restored service.

Initially, most of the train ran between Washington and Portland with two cars being attached to the Pine Tree in Portland for service to Bangor. In 1947, the terminus moved from Washington to New York Penn Station although thru car service was maintained to Philadelphia. In 1950, Grand Central Terminal replaced Penn Station as the terminus, removing the Pennsylvania Railroad as one of the East Wind’s operators. The train initially had connecting service in Lowell to Plymouth, NH via Lake Winnipesaukee, Rockland, ME with a connection in Portland, and Lewiston, ME in Portland as well.

The B&M’s annual reports noted that the East Wind revenue was outstandingly good for its first several seasons. One reason was that it was marketed as an alternative to driving. One poster read, Who now would think of driving over hot, crowded highways, when so superbly appointed a train awaits?


When the East Wind began, most of the interstate highways had yet to be constructed and while some of the main travel routes such as Route 1 had interstate-like elements, with limited grade separation and higher speed limits, roadside gas stations, restaurants and motels had sprung up alongside too, making these routes dangerous, congested and slow. However, the advent of tolled turnpikes and interstates significantly reduced travel times and relegated roadside amenities to exits and rest stops. For example, following Route 1 instead of I-95 just in Maine adds one hour of travel time. As more interstates were constructed, train travel times were unable to keep up and more people abandoned trains for the automobile. By 1955, the East Wind ran for its last summer. While it was scheduled to run through September 11, the train ended three weeks early thanks to a hurricane washing out tracks in southern New England.

Resuming direct train service to northern New England is feasible. Following its original route from Washington, DC to New Haven, it would then use the recently upgraded Hartford Line to Springfield. It would use CSX freight railroad’s Springfield-Worcester line which Massachusetts plans to upgrade to add more service. In Worcester, it would switch to a lightly used CSX line that has not hosted passenger trains since 1960, running to Ayer. It would then use CSX’s line to Lowell and Ballardvale where it would link to the existing Downeaster service. That 52-mile section of track would require upgrades to allow 79 mph passenger trains. 

One way to restore service quickly is to add five cars to the Vermonter and split that train to Springfield, allowing five new cars to run to Maine. If the new train replaces one of the Downeaster’s frequencies, only five new cars and one additional locomotive would be needed. Initially, the train would take 11:46 between Washington and Portland (see timetable below), slower than the East Wind’s 11:15, but subsequent upgrades could reduce travel time to 9:00.

Until the East Wind returns, I look forward to my train trip via Boston.